STEP 01 · Connect the workflow requirements to the business value

Tell us what needs to happen

Show us the manual process, theapplications involved, and the outcome you want. If you have a businessrequirements document, we start there. If not, we help define the events,information, and decisions that make the workflow work.
‍
We also identify the information you needto measure results—such as response times, SLA performance, invoice status, ormaintenance history—and which systems must supply it.
YOU BRING
Thebusiness goal, system names, process owner, and examples of the records orhandoffs involved.
WE HELP DEFINE
The source of truth, trigger,  destination, business rules, exceptions, and measures of success.
YOU RECEIVEAn agreed starting point for the integration scope.
workflow brief
SAMPLE
Building management system → CMMS
Alarm raised in the building management system
A validated building alarm creates a correctly matched CMMS work order, with the agreed status updates synchronized between systems.

STEP 02 · ASSESS THE SYSTEMS AND APIS

We investigate the integration path

Our team reviews the available interfaces, authentication, data structures, permissions and vendor requirements. When needed, we work with your software provider to clarify API access and limitations.
Don’t see your system in our connectorlibrary? We’ll investigate the available integration paths.
WHAT’S INCLUDED AT NO COSTInitialconnector research and feasibility assessment are offered at no cost. Detaileddesign, implementation, licenses, and ongoing managed services are scopedseparately. Any third-party access requirements or charges are identifiedduring the assessment
YOU RECEIVEInitial feasibility findings, keydependencies, and a recommended next step.The assessment checklist is useful. “Access:To be arranged” and “Event support: Needs vendor confirmation” arereasonable states in an illustrative assessment.
assessment checklist
SAMPLE
Documentation
Available
Access
To be arranged
Objects and actions
Reviewed
Event support
Needs vendor confirmation
Constraints
Noted

STEP 03 · BUILD AND CONFIGURE

We configure the integration around your business rules

We use ConnectorHub, reusable connectors,and AI-assisted tools to map fields, transform records, and configure workflowsaround your business rules. Where custom development is required, we identifyit and agree on the scope before building.
YOU RECEIVEThe agreed connector configuration, mapping, validation rules, exception paths and a testable workflow.
field mapping · approval
SAMPLE
alarm.point_name asset_id
alarm.site_code location_id
alarm.severity priority
Business rule

Create work orders only when location and asset mappings are valid. Route missing or ambiguous matches for review

Mapping review required before deployment

STEP 04 · TEST AND VALIDATE

Prove the workflow before it goes live

We test representative records, field accuracy, expected actions and failure scenarios in the agreed test environment. Your team confirms that the integration supports the business process.
YOU VALIDATE
Correct records
Correct timing
Required approvals
Appropriate handling of missing or failed data
YOU RECEIVEDocumented test results, resolved issues or agreed exceptions, and a production-readiness decision.
acceptance checklist
SAMPLE
Valid record
Passed
Missing identifier
Passed
Duplicate event
Passed
Unavailable destination
In review
User sign-off
Pending

STEP 05 · DEPLOY AND SUPPORT

Launch with clear ownership

We coordinate production access, rollout and handoff. ConnectorHub provides integration visibility, and ConnectorHub can provide ongoing monitoring, troubleshooting, maintenance and enhancements under an agreed support arrangement.
YOU RECEIVEA production workflow, support contacts, operating documentation and defined responsibilities.
handoff
SAMPLE

Monitoring view

Integration visibility on the ConnectorHub platform

Support owner

Agreed in the support arrangement

Change process

How enhancements and updates are requested

STEP 06 · WHAT WORKING TOGETHER LOOKS LIKE

A Practical Path from Planning to Implementation

YOUR TEAM
Explain the business process and desired outcome.
Introduce system owners and arrange approved access.
Confirm mappings, rules and acceptance criteria.
Approve production use and data access.
CONNECTORHUB
Translate the need into an integration approach.
Investigate interfaces and coordinate technical questions.
Configure and test the workflow.
Support rollout and the agreed operating model.

We focus on the workflow and the result you need, with implementation and support scope agreed up front.

STEP 08 · FAQ

Frequently asked questions

Do we need a business requirements document?

No. An existing document helps, but we can begin with your workflow and system requirements.

What does the free assessment cover?

Initial connector/API research and feasibility. It does not include a free build, vendor licenses, production rollout or ongoing managed services.

Can you talk to our software provider?

Yes, with the appropriate introductions and authorization. API access remains subject to the provider’s process and your agreement with them.

How is the timeline determined?

Access, API maturity, data quality, workflow complexity and testing determine the plan. We confirm a schedule after reviewing those dependencies rather than promise a universal deployment time.

Can we manage it ourselves afterward?

The delivery plan can include handoff or ongoing managed support, depending on your needs and the agreed platform arrangement.

Tell us what your systems need to do together.

Start with the applications, the workflow and the problem you are trying to solve. We’ll help define the clearest next step.